Study on engineering cost forecasting of electric power construction based on time response function optimization grey model

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)
Li Wei ; Dept. of Econ. & Manage., North China Electr. Power Univ., Baoding, China ; Yuan Ya-nan ; Dong Wei-dong ; Zhang Bo

This paper discussed an improved gray forecasting model for electric power construction project engineering cost forecasting. A method of time response function optimization is proposed, namely using constraint condition of minimum Euclidean distance of original sequence and simulation value to determine the constant C, build time response function optimization grey forecasting model, and then make better use of the original message. Apply the improved model to forecast the main engineering cost index of electric power construction. Compare this grey forecasting method with regression forecasting method, the results show that improved model has higher prediction accuracy and the effect of actual application is better than before.