Cart (Loading....) | Create Account
Close category search window
 

A numerical simulation study on the chemical reinforcement area at shield start shaft

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Zeng Hui ; Sch. of Civil Eng. & Archit., Wuyi Univ., Jiangmen, China ; Hu Jun ; Yang Ping

When the ends of shield tunnel in soft soil regions are reinforced in a chemical manner, it is vital to solve some urgent key problems, such as determining the range of shield start shaft which requires reinforcement, the reinforcement time of various reinforcement techniques. Frequently-adopted methods to reinforce the soil at the shield tunnel ends were summarized in this paper first, then by combining the case of shield launching project (exclusive of aquifer) of Fenhu Road Station's west end in Suzhou Subway, ADINA program was applied here to conduct simulation analysis of different reinforcement areas at shield start shaft under the most unfavorable construction condition-removal of the sealed door. The research indicates: a) Frequently-adopted methods to reinforce shield tunnel ends include deep mixing method, high pressurized jet grouting, artificial freezing and precipitation technique, etc. Soil reinforcement may adopt one method or combination of many methods; b) According to the numerical simulation, when longitudinal reinforcement length reaches 3mm, the soil shall move towards the working well in the tunneling direction of shield tunnel, the maximum displacement occurs in the center of exposed tunnel face, up to 12.92mm. Surface soil above the sealed door becomes deformed most, settling by approximately 3.0mm and soil within the strong reinforcement area is stressed in designed strength range; c) At the shield start shaft which is exclusive of aquifer, if the longitudinal reinforcement length reaches 3m, requirements in both strength and deformation can be met, and it is considerably safe; d) Most of the shield tunnel ends in Suzhou Subway are distributed in rich water-bearing layer (especially water-bearing sand layer), therefore, the longitudinal reinforcement length is usually designed to be 9m.

Published in:

Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on

Date of Conference:

22-24 April 2011

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2014 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.