By Topic

Development of On-Line Monitoring System of Substation Power Equipment Based on IEEE1588 Standard

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
Fu Qin-cui ; Electr. & Electron. Eng. Sch., East China Jiaotong Univ., Nanchang, China

With the development of digitization of substation, the future trend of on-line monitoring system of substation power equipment is adopting the IEC61850 standard to realize seamless communication. However, the change of distance and node make synchronization precission of samples transmission become a problem. An implementation method based on the IEEE1588 standard is proposed, by use of DP83640 Ethernet PHYTER which includes all of the hardware to implement the IEEE1588 Precision Time Protocol. The design not only implements the precise time synchronization between the master clock and slave clocks of the distributed on-line monitoring system based on Ethernet, but also shortens the design cycle.

Published in:

Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific

Date of Conference:

25-28 March 2011