Cart (Loading....) | Create Account
Close category search window
 

Potential Micro-Hydropower Assessment in Mun River Basin, Thailand

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

6 Author(s)
Kosa, P. ; Inst. of Eng., Suranaree Univ. of Technol., Nakhon Ratchasima, Thailand ; Kulworawanichpong, T. ; Horpibulsuk, S. ; Chinkulkijniwat, A.
more authors

In Thailand, fossil and coal fuel energies are normally used for electrical generation and the tendency of used fossil and coal fuel energy is continuously increasing. There are about 1300-1500 mm rainfall and 1467 reservoirs in Mun river basin, which covers 71,071 square kilometers in lower northeastern of Thailand. Then, micro-hydropower is of interest as a renewable energy form of mankind for providing electricity for rural community. The purpose of this paper is to assess the potential micro-hydropower sites of more than 50 kW but not over than 10 MW. Reservoir type is considered for potential micro-hydropower assessment. The discharge in reservoir and the head in dam are considered to generate electricity. The main objective of the reservoir is not affected from the electrical production. Also, a large flooding is not occurs from this installation. The result revealed that there are 24 reservoirs in irrigation projects where both discharge and head are suitable for electricity generation. However, stream flow during dry season is very low therefore electricity can be produced in rainy season. The maximum power load is 3.15 × 106 kW in a year and installed generator is 6000 kW. If the electricity is produced, it will be used by these 24 irrigation projects. Then, stakeholders will able to earn this benefit. The potential micro-hydropower sites from this research should be continuously evaluated for the feasibility study to build and operate the micro-hydropower plant.

Published in:

Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific

Date of Conference:

25-28 March 2011

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2014 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.