By Topic

300MW CFB Direct Air Cooled System Frostproof Control Strategy Optimization

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Bai Jianyun ; Eng. Coll., Shanxi Univ., Taiyuan, China ; Shao Jiaxiao

First proposed the Shanxi Coal Power Plant Phase Il Pingshuo 2X300MW CFB direct air cooled system winter frostproof protection of frost question, introduced its direct air cooled system of the power plant control system, elaborated the automatically controlled scheme of frostproof in the direct air cooled system, analyzing the existing existence question and earring on to optimization the existing programs, meanwhile, the engineering operation for further elaboration and analysis, optimized the direct air cooled system's frostproof protection control scheme.

Published in:

Computer Distributed Control and Intelligent Environmental Monitoring (CDCIEM), 2011 International Conference on

Date of Conference:

19-20 Feb. 2011