By Topic

Operation scheme for the weak structure power grid

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$33 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Fu Zhaoyuan ; School of Electrical Engineering of Shandong University, Jinan, 250061, China ; Chen Qing ; Gao Zhanjun

A weak structure power grid is usually characteristic of weak structure, light load and long transmission distance. The grid of Republic of Congo is taken as an example to analyze special problems existed in the operation of such grids. Over-voltage in operation and the impact of generator integration on weak structure power system are focused. After a detailed discussion, a solving scheme was proposed. The simulation shows that the proposed scheme can ensure the safe and reliable operation of this grid; it can solve the problems existed in the parallel in of the generator. Result of this paper is also of some reference significance for solving similar problems in China.

Published in:

CICED 2010 Proceedings

Date of Conference:

13-16 Sept. 2010