By Topic

Load frequency control of hybrid systems in open access environment

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Parashuramulu, B. ; Dept. of Electr. Eng., NIT Kurukshetra, Kurukshetra, India ; Kumar, A.

In this paper, conventional control method has been developed for the design of Integral controller gain, applied to automatic generation control (AGC) in three-area hybrid power system after deregulation. The conventional three-area AGC system is modified to take into account the effect of bilateral contracts on the dynamics of automatic generation control. A three area deregulated power system with each area containing two Gencos and Discos with hybrid turbines have been considered for application. After deregulation, to describe bilateral contract for three-area AGC, Disco participation matrix has been considered. The performance of system is studied for different bilateral contracts cases.

Published in:

India Conference (INDICON), 2010 Annual IEEE

Date of Conference:

17-19 Dec. 2010