By Topic

Optimal operation of controllable load and battery considering forecasted error

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

6 Author(s)
Goya, T. ; Dept. of Electr. & Electron. Eng., Univ. of the Ryukyus, Okinawa, Japan ; Uchida, K. ; Senjyu, T. ; Yona, A.
more authors

Recently, the deregulation and liberalization in power market increase the competition in retail and power sector. Therefore power company needs to reduce operational cost and maximizes the profit by operating generator with higher efficiency. On the other hand, energy consumption is increasing rapidly due to the proliferation of all-electric houses. So the controllable load such as electric water heater, heat pump and electric vehicles are introduced to power systems. However conventional system does not operate the thermal unit and controllable load in a coordinated manner. This paper focuses on operating the controllable load, battery and thermal units in a coordinated manner. Furthermore, this paper consider the forecasted error for load demand and renewable energy. The proposed method uses a tabu search for optimization method. Optimizing procedure is divided by two parts. Firstly, actual load is controlled by controllable load and battery. Finally, the schedule of thermal unit commitment problem is decided in the revised load.

Published in:

Electrical Machines and Systems (ICEMS), 2010 International Conference on

Date of Conference:

10-13 Oct. 2010