By Topic

Influence of Ring Main Units and Substations on Online Partial-Discharge Detection and Location in Medium-Voltage Cable Networks

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$33 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)

Online partial-discharge (PD) monitoring of medium-voltage power cables is traditionally performed on a cable between two consecutive ring main units (RMUs). PD location is achieved using a sensor at each cable end. Monitoring multiple consecutive cables, with RMUs in between, using a single monitoring system is more efficient. In addition, substations and RMUs without possibilities for sensor installation can be circumvented by installing the sensor at the next RMU. This paper studies how RMUs and substations along the cable under test affect online monitoring, including their influence on detection sensitivity, location accuracy, and charge estimate accuracy. Single-sided PD measurement, including PD location, with an RMU or substation at the far end is also considered. Models for RMUs and substations are proposed and verified by measurements. The performance of online PD monitoring is studied for a number of network configurations.

Published in:

IEEE Transactions on Power Delivery  (Volume:26 ,  Issue: 2 )