By Topic

Parameter Optimization of SFCL With Wind-Turbine Generation System Based on Its Protective Coordination

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)
Woo-Jae Park ; Sch. of Electr. & Electron. Eng., Yonsei Univ., Seoul, South Korea ; Byung Chul Sung ; Kyung-Bin Song ; Jung-Wook Park

This paper describes a study to determine the optimal resistance of a superconducting fault current limiter (SFCL) connected to a wind-turbine generation system (WTGS) in series considering its protective coordination. The connection of the WTGS to the electric power grid may have serious effects on the stability and reliability of the overall system during a contingency due to the increase in fault currents. Moreover, it causes malfunction in the protective devices such as overcurrent relays (OCRs). To deal with this problem, the SFCL is applied to reduce the level of fault current increased by the connection of the WTGS. Then, to determine the optimal parameter of the SFCL, protective coordination between the existing multiple OCRs is considered based on the computation of fault current by the equivalent voltage source method. The effectiveness of the optimal resistance for the SFCL is evaluated by the time-domain simulation with the power systems computer aided design/electromagnetic transients including DC (PSCAD/EMTDC) software. The results show that protective coordination is well maintained without changing the previous settings of existing OCRs by applying the SFCL with its optimal parameter. Therefore, the system can keep its suitable reliability even when the level of fault current is increased by connecting the WTGS to the power system.

Published in:

Applied Superconductivity, IEEE Transactions on  (Volume:21 ,  Issue: 3 )