By Topic

Implementation of power system control board test system of the pure electric vehicle

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Bi Wei ; Tian Jin Polytech. Univ., Tianjin, China ; Wang Jian-ming

Power system control board is core of the pure electric vehicle power system. The main detection method of power system control board is manual. The disadvantages of this method are time-consuming and low accuracy. Based on virtual instrument, this paper dedicates a method which uses the LABVIEW graphical programming language to achieve the detection system for power system control board. Measurement of power system control board is visual and automatic. The testing precision and efficiency is improved and the overall test time will be shortened from 20 minutes to 5 minutes. For the first time, three-parameter sine wave curve-fit algorithm is used in the phase delay detection of current sensor sampling circuit in power control board and this method solves problem of large error by the manual testing.

Published in:

Advanced Computer Theory and Engineering (ICACTE), 2010 3rd International Conference on  (Volume:6 )

Date of Conference:

20-22 Aug. 2010