By Topic

A Practical Guide to the Mechanics of Performing an Arc Flash Study at Commercial & Industrial Facilities

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)

This paper presents practical engineering aspects of conducting an Arc Flash Study. For about twenty years, the study and application of Arc Flash Analysis has focused on the individual bus application as per IEEE stnd 1584. And same is done with NFPA 70E. We find that most of the articles written about conducting an arc flash study are based on having all the information readily available. However, there is very little, if anything, documented on how to conduct this huge effort of collecting all the necessary information safely. A methodology on how to efficiently and categorically gather all the necessary information in a safe manner is needed. This involves considerations such as, naming conventions, various personnel and departments involved, outages, and lastly but most importantly the time needed to collect all the data. Furthermore, based upon our experiences we would share some mitigation strategies for equipment installations which do not easily fit into nominal situations. An example of a recently conducted study is presented.

Published in:

Industry Applications Society Annual Meeting, 2009. IAS 2009. IEEE

Date of Conference:

4-8 Oct. 2009