By Topic

Geomagnetically Induced Currents in the High-Voltage Power Grid in China

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Chun-ming Liu ; Sch. of Electr. & Electron. Eng., North China Electr. Power Univ., Beijing, China ; Lian-guang Liu ; Pirjola, R.

With the operation of long transmission lines, unknown severe vibration and noise in transformers have sometimes been observed at the Shanghe substation and at the Ling'ao nuclear power plant in China. This paper gives a comparison of magnetic-storm recordings and measured transformer neutral current data and confirms that the disturbances were caused by geomagnetically induced currents (GICs). On November 7 and 9, 2004, the maximum GIC at the Ling'ao nuclear power plant was 47.2 A and 75.5 A, respectively, which are both larger than the neutral DC current caused by the HVDC monopole operation. The analysis of GIC data indicates that the GIC level is mainly determined by the geomagnetic-field variation rate, but the earth conductivity and power grid parameters are also important factors affecting GIC values. The data show that the GIC level is higher at the Ling'ao nuclear power plant than at the Shanghe substation. The reason is considered to be related to the grid structure and to the coast effect. Furthermore, because of smaller resistances, longer transmission lines, a larger scale, and the adoption of single-phase transformers, the influences of GIC on the ultra-high voltage power grid being constructed in China need to be studied more urgently.

Published in:

Power Delivery, IEEE Transactions on  (Volume:24 ,  Issue: 4 )