By Topic

A methodology for the identification of the sustainable wind potential. The Portuguese case study.

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$33 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
T. Simoes ; Department of Renewable Energies, National Institute of Engineering, Technology and Innovation-INETI, Est. do Paço do Lumiar, 1649-038 Lisbon, Portugal ; P. Costa ; A. Estanqueiro

The exponential grow of the wind sector in Portugal required the development of planning tools for the siting of the wind farms, its connection to the existing grid, as well as the assessment of the country's existing wind resource capable of enabling an economic, social and environmental sustainable development. The methodology developed and presented in this paper was initiated a decade ago with the classification of the existing wind data adequate to wind energy resource assessment as well as the identification of the constraints to the deployment of wind power plants. This GIS based methodology was systematically applied to the Portuguese territory and resulted on the identification of the available optimum sites for wind plant development at the lowest grid connection costs. The methodology may be easily applied to other countries or regions, thus enabling a systematic and objective approach to the wind power deployment.

Published in:

Power Systems Conference and Exposition, 2009. PSCE '09. IEEE/PES

Date of Conference:

15-18 March 2009