Close category search window
 

Reactive Power and Voltage Control in Distribution Systems With Limited Switching Operations

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Liu, M.B. ; Electr. Power Coll., South China Univ. of Technol., Guangzhou ; Canizares, C.A. ; Huang, W.

An algorithm based on a nonlinear interior-point method and discretization penalties is proposed in this paper for the solution of the mixed-integer nonlinear programming (MINLP) problem associated with reactive power and voltage control in distribution systems to minimize daily energy losses, with time-related constraints being considered. Some of these constraints represent limits on the number of switching operations of transformer load tap changers (LTCs) and capacitors, which are modeled as discrete control variables. The discrete variables are treated here as continuous variables during the solution process, thus transforming the MINLP problem into an NLP problem that can be more efficiently solved exploiting its highly sparse matrix structure; a strategy is developed to round these variables off to their nearest discrete values, so that daily switching operation limits are properly met. The proposed method is compared with respect to other well-known MINLP solution methods, namely, a genetic algorithm and the popular GAMS MINLP solvers BARON and DICOPT. The effectiveness of the proposed method is demonstrated in the well-known PG&E 69-bus distribution network and a real distribution system in the city of Guangzhou, China, where the proposed technique has been in operation since 2003.

Published in:
Power Systems, IEEE Transactions on  (Volume:24 ,  Issue: 2 )

Date of Publication: May 2009

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2013 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.