By Topic

Reliability Assessment of a Backup Gas Turbine Generation System for a Critical Industry Load Using a Monte Carlo Simulation Model

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Chowdhury, A.A. ; California Indep. Syst. Operator, Folsom, CA ; Koval, D.O.

The Alberta Interconnected Electric System (AIES) forms a single integrated transmission network serving the Province of Alberta, Canada. A number of large critical industrial loads are served by the AIES. These loads operate 24 h a day and seven days a week. This paper deals with a critical industrial load which is normally supplied by the Alberta provincial grid through two 72-kV lines. This load also maintains a backup generation system consisting of a set of gas turbines to meet its operating demands in the case of Alberta grid failure. The basic objective of this paper is to derive the optimal number of gas turbines that this critical load should maintain in order to satisfy the plant's reliability criteria in the case of grid failure for continuity of its operation. A Monte Carlo simulation model is developed to assess the adequacy of the backup gas turbine system, and the results of a series of case studies performed using the developed model are presented in this paper.

Published in:

Industry Applications, IEEE Transactions on  (Volume:45 ,  Issue: 1 )