By Topic

Analysis on Fault of Yun-Guang hybrid AC/DC Power Transmission System

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$33 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

5 Author(s)
Liu Kezhen ; Department of Electric Engineering, Harbin Institute of Technology, Harbin, Heilongjiang, China- 150001. e-mail: liukzh@sina.com.cn ; Shu Hongchun ; Chen Yong ; Shun Shiyun
more authors

This paper addresses the transient response of instant ground fault in Yun-Guang hybrid UHVDC/AC power transmission system. A detailed bipolar UHVDC electromagnetic transient model is established by PSCAD/EMTDC software. The control strategies for UHVDC system are investigated and the main factors of commutation failure are analyzed. A lot of simulation results demonstrate that Yunnan rectifier AC system fault can not cause UHVDC commutation failure. Metallic ground fault of Guangdong inverter AC system will result in UHVDC commutation failure but enough transition resistance can reduce the chance of it. When one pole ground fault of UHVDC line occurs, DC current of the fault pole has an obvious overshoot and non-fault pole is influenced a little. UHVDC can come back to normal operation once the instant ground fault is cleared.

Published in:

Power System Technology and IEEE Power India Conference, 2008. POWERCON 2008. Joint International Conference on

Date of Conference:

12-15 Oct. 2008