By Topic

Real-Time and Off-Line Simulation of a Detailed Wind Farm Model Connected to a Multi-Bus Network

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)
Paquin, J.-N. ; Opal-RT Technol., Montreal, QC ; Moyen, J. ; Dumur, G. ; Lapointe, V.

This paper describes the detailed modeling and simulation of a wind farm composed of eight doubly-fed induction generators (DFIG) connected to a 24-bus electrical network. Once built, the model was brought to real-time using the eMEGAsim, a Simulink-based, distributed real-time simulator of electrical power systems. Then, analysis of the steady-state and transient response of the system is made. Finally, the paper concludes with a discussion on the off-line performance and the real-time performance on the eMEGAsim simulator.

Published in:

Electrical Power Conference, 2007. EPC 2007. IEEE Canada

Date of Conference:

25-26 Oct. 2007