Study on the Key Equipment's Insulation Level of ±800kV UHVDC Power Transmission Project

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Lv Jinzhuang ; China Southern Power Grid Co., Ltd., Guangzhou ; Li Licheng

China is currently pushing on constructing plusmn800 kV UHVDC power transmission projects. The Yunnan-Guangdong power transmission project to be built in 2009 will be the first UHVDC power transmission project around the world. The paper has presented insulation level and insulation coordination for the key equipment, which would be adopted in the Yunnan-Guangdong UHVDC Project. The research result herein reveals that, compared to 1.6 times insulation level of the key equipments of traditional plusmn500 kV project, it is practical to reduce that of UHVDC project respectively, and the technical measurement would be rational arrangement of arrester and smoothing reactor and reasonable reduction of insulation margin. Furthermore, the test voltage level corresponding to long DC operation voltage has also been discussed in this paper, which is for evaluating internal insulation withstanding capability.

Published in:

Power Engineering Society Conference and Exposition in Africa, 2007. PowerAfrica '07. IEEE

Date of Conference:

16-20 July 2007