1 Author(s)
Ferreira Brandao, A. ; Dept. of Electr. Energy & Autom. Eng., Univ. of Sao Paulo, Sao Paulo

Markov chains are used in the reliability modeling of substation diagrams. In the adopted approach three states are assigned to the equipment operating conditions, corresponding to the normal, overload and repair states. Models are built including emergencies up to the second order. The overload influence on component failure rate and on substation reliability indices is examined. The components studied with more detail are the power transformer and the cables insulated with extruded material. The solution is achieved by the minimal tie-and-cut-set method and equations are developed for contingencies up to second order. Finally, an example is presented of a distribution substation and two load cycles.

Published in:

Latin America Transactions, IEEE (Revista IEEE America Latina)  (Volume:6 ,  Issue: 1 )

Date of Publication:

March 2008

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2014 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.