Scheduled System Maintenance:
Some services will be unavailable Sunday, March 29th through Monday, March 30th. We apologize for the inconvenience.
By Topic

Optimal Parameter Estimation for Hydro-Plant Performance Models in Economic Operation Studies

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
El-Hawary, M.E. ; Department of Electrical Engineering Technical University of Nova Scotia P.O. Box 1000, Halifax, Nova Scotia Canada, B3J 2X4 ; Kumar, M.

Optimal Economic Operational schedules in hydro-thermal electric power systems are obtained on the basis of models of the various subsystems involved. In this paper we are concerned with models of hydro-plant performance characteristics. Due to the diversity of plant types and installations, a number of models have been proposed in developing optimal operational strategies over the years. Here we choose four commonly used models. The problem of finding optimal estimates of model parameters is investigated for the Glimn-Kirchmayer model, the Hildebrand model, the Hamilton-Lamont model and the Arvanitidis-Rosing model. We develop the optimal estimator equations for each model using the weighted-least-squares approach. The result for three of the models is a set of nonlinear equations in the unknown parameters. We adopt Newton's method for actually implementing the optimal estimators. Due to the sensitivity of the algorithm's convergence characteristics to the initial guess of the unknowns, we explore and present procedures for generating initial guess values to improve the procedure's performance. Computational experience with the techniques is given in the paper to confirm its feasibility using test data from existing hydro-plants. The paper proposes and examines some extensions to the classical models to improve the accuracy of the modeling process.

Published in:

Power Systems, IEEE Transactions on  (Volume:1 ,  Issue: 4 )