By Topic

Optimal Short Term Operation Planning of a Large Hydrothermal Power System Based on a Nonlinear Network Flow Concept

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)
Brannlund, H. ; Energy Systems Laboratory Royal Institute of Technology S-100 44 Stockholm, Sweden ; Bubenko, J.A. ; Sjelvgren, D. ; Andersson, N.

This paper presents a procedure for solving the short term generation scheduling problem for a large hydrothermal system that includes transmission limitations. The integrated system is divided into a hydro and a thermal subsystem. A reduced gradient algorithm is employed for the solution of the hydro subproblem. This algorithm is specialized to efficiently solve nonlinear network flow problems with additional constraints of non-netwrk type. The thermal subsystem is solved using a fast unit commitment and dispatch algorithm. A case study with the Swedish system is discussed.

Published in:

Power Systems, IEEE Transactions on  (Volume:1 ,  Issue: 4 )