By Topic

Design and Operating Experience Problems with Control and Instrumtation Systems Pilgrim Nuclear Power Station - Unit 1

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
Morisi, A.V. ; Pilgrim Nuclear Power Station Boston Edison Company Plymouth, Massachusetts

The Pilgrim Nuclear Power Station is a 690 MWe General Electric designed Boiling Water Reactor. Pilgrim is located forty (40) miles south of Boston at Plymouth, Mssachusetts. It is situated on the Atlantic Seaboard (Cape Cod Bay) and uses circulating sea water for condensate cooling in the condenser. Pilgrim was granted a construction permit in August, 1968, achieved initial criticality in June, 1972 and began commercial operation in December, 1972. Bechtel Corporation was the prime contractor. For the first six (6) months of commercial operation, Pilgrim achieved a percent availability of 91.7 percent. I am pleased to report that generally speaking, the instrumentation and control system problems which developed during construction, startup and operation were of a routine nature. No outstanding problems arose requiring indepth re-evaluation and drastic design changes. The instrumentation and control systems have performed as expected. No false scrams have occurred which could be attributed to design deficiencies. Station Technical Specifications require that extensive routine testing on operating equipment be continuously performed to verify operability and locate and eliminate problems that could negate the required operability of said instrumentation when required. This paper discusses some of these Instrumnntation and Control System problems encountered and the solutions to these problems. This paper describes four (4) problems covering design and operating experience with the control and instrumentation systems for Pilgrim Nuclear Power Station Unit 1.

Published in: