A Large Wind Power System in Almost Island Operation—A Danish Case Study

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Akhmatov, V.. ; Siemens Wind Power A/S, Brande ; Eriksen, P.B.

In Denmark, incorporation of wind power into the power system is increasing whereas power generation from the large conventional power plants is reducing. The common concern has become maintenance of reliable and stable operation of the Danish power system with a large amount of wind power - the large wind power system. At present, maintaining the voltage stability of such a large wind power system relies on strong ac connections to neighboring power systems with sufficient reactive power and voltage control and on control of central power plants in Denmark. This paper presents the results of a stability investigation carried out by the Danish transmission system operator (TSO), Energinet.dk, for the case of almost island operation of the Western Danish wind power system. The main ac lines connecting Western Denmark to the synchronous area of the Union for the Co-ordination of Transmission of Electricity (UCTE) were out of service and the wind power generation was high. The investigation has shown that the reactive power and voltage control of the domestic power plants is essential for maintaining short-term voltage stability of the Western Danish wind power system and becomes even more relevant when ac connections to the strong transmission system of the UCTE are out of service. The results presented in this paper may also be relevant for the operators of the power systems that are in island ac operation and with plans for significant commissioning of wind power - Great Britain, Ireland, Tasmania, etc.

Published in:

Power Systems, IEEE Transactions on  (Volume:22 ,  Issue: 3 )

Date of Publication:

Aug. 2007

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2014 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.