By Topic

Multi-Period Production Capacity Planning for Integrated Product and Production System Design

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Kazancioglu, E. ; Inst. for Manuf., Cambridge Univ., MA ; Saitou, K.

This paper presents a simulation-based method to aid multi-period production capacity planning by quantifying the trade-off between product quality and production cost. The product quality is estimated as the statistical variation from the target performances obtained from the output tolerances of the production machines that manufacture the components. The production cost is estimated as the total cost of owning and operating a production facility during the planning horizon. Given demand forecasts in future production periods, a multi-objective genetic algorithm searches for the optimal types and quantity of the production machines to be purchased during each period, which simultaneously maximize the product quality and minimize the production cost during the entire planning horizon. Case studies on automotive valvetrain production are presented as a demonstration

Published in:

Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on

Date of Conference:

8-10 Oct. 2006