By Topic

A New Era in Auditable, Human Engineered Control System Design--Nureg 0700

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
Tivingston, W.L. ; Ebasco Services Inc. Two World Trade Center

NUREG 0700 titled, "Guidelines for Control Rxi iDesign Reviews", produced by the Nuclear Regulatory Camission (NRC) as part of the MI-2 action plan, describes the lessons-learned requirements for a systematic analysis of plant operation as a basis for design of the Operational Man-Machine System (OMMS). The emphasis of this analysis on off-normal operations ccmpared to industry practice is explained and a method for off-normal scenario identification practice is presented. A possible approach for conducting audits of the operating system reflecting the off-normal emphasis is then described.

Published in:

Power Apparatus and Systems, IEEE Transactions on  (Volume:PAS-101 ,  Issue: 8 )