Field tests of a circuit breaker synchronous control

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

6 Author(s)
Rajotte, R.J. ; Hydro-Quebec, Montreal, Que., Canada ; Charpentier, C. ; Breault, S. ; Le, H.H.
more authors

A circuit breaker synchronous control interface which controls the point-on-wave at which shunt reactor circuit breakers open or close has been developed and tested on Hydro-Quebec's 735-kV power system. It takes into account the influence of outdoor temperature on the breaker closing and opening times. It is also equipped with a reignition and a high-inrush-current detection system. Opening tests at different preset arcing times were conducted and the arcing time range where there are no re-ignitions in air-blast breakers was established. The tests showed that the interface is a valuable device for the elimination of re-ignitions associated with the interruption of small inductive currents. Closing tests have shown that the interface is also useful for the limitation of high inrush currents by selecting an appropriate point-on-wave for circuit breaker closing

Published in:

Power Delivery, IEEE Transactions on  (Volume:10 ,  Issue: 3 )