By Topic

Integrating AGV schedules in a scheduling system for a flexible manufacturing environment

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Pu, P. ; Dept. of Comput. Sci. & Eng., Connecticut Univ., Storrs, CT, USA ; Hughes, J.

In a job shop where machining time takes a comparable amount as material transportation time, it is no longer realistic to ignore the scheduling of material transportation systems such as automated guided vehicles (AGVs). The authors' algorithm discussed in this paper integrates AGV schedules into a heuristic-based scheduling algorithm to achieve the maximum amount of flexibility and optimization for a flexible manufacturing environment. Furthermore in order to allow their system to achieve different optimization goals such as shortest schedules or schedules that require the minimum computation time, the authors' system architecture consists of individual modules of heuristics so that one or any combination of these modules can be used. The authors then discuss how they control the use of these heuristic modules to achieve the best results with some experimental data

Published in:

Robotics and Automation, 1994. Proceedings., 1994 IEEE International Conference on

Date of Conference:

8-13 May 1994