A period-processor-time-minimal schedule for cubical mesh algorithms

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$33 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
C. Scheiman ; Dept. of Comput. Sci., California Univ., Santa Barbara, CA, USA ; P. Cappello

Using a directed acyclic graph (dag) model of algorithms, we investigate precedence-constrained multiprocessor schedules for the n×n×n directed mesh. This cubical mesh is fundamental, representing the standard algorithm for square matrix product, as well as many other algorithms. Its completion requires at least 3n-2 multiprocessor steps. Time-minimal multiprocessor schedules that use as few processors as possible are called processor-time-minimal. For the cubical mesh, such a schedule requires at least [3n2/4] processors. Among such schedules, one with the minimum period (i.e., maximum throughput) is referred to as a period-processor-time-minimal schedule. The period of any processor-time-minimal schedule for the cubical mesh is at least 3n/2 steps. This lower bound is shown to be exact by constructing, for n a multiple of 6, a period-processor-time-minimal multiprocessor schedule that can be realized on a systolic array whose topology is a toroidally connected n/2×n/2×3 mesh