Notification:
We are currently experiencing intermittent issues impacting performance. We apologize for the inconvenience.
By Topic

An algorithm for the optimal scheduling of variable head hydro and thermal plants

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Rashid, A.H.A. ; Malaya Univ., Kuala Lumpur, Malaysia ; Nor, K.M.

The authors present an efficient and optimal method of scheduling thermal plants in coordination with fixed and variable hydro units. From the system model of the cost function, energy balance and water availability constraints, a set of coordination equations were derived from Kuhn-Tucker conditions of optimality. The equations when linearized were found to be partially separable. By neglecting the second order differentials of power losses the equations were made separable and this enabled the coordination equations to be reduced to two sets of equations and thus the Lagrange multiplier for the water availability constraints can be solved separately from unit generations instead of simultaneously. once the Lagrange multiplier of the reservoir constraint was determined the values of other variables were calculated by back substitutions. The reduction of the coordination equations reduced the size of the matrix to be inverted. Furthermore the matrix has a special structure that allowed its inverse to be computed directly and easily. Case studies with various systems were carried out to test the efficiency of the proposed algorithm and the detailed result of one test case is discussed

Published in:

Power Systems, IEEE Transactions on  (Volume:8 ,  Issue: 3 )