Installation of the first bulk power 380 kV underground transmission cable system in Saudi Arabia

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.
4 Author(s)
Schneider, P. ; Lahmeyer Int. GmbH, Frankfurt, West Germany ; Wada, Y. ; Yoshida, N. ; Miura, I.

The design, manufacture, testing and installation of the 380 kV long-distance bulk power underground transmission line installed in Jeddah, Kingdom of Saudi Arabia, are discussed. The line consists of two routes with a length of 14.2 km and 12.6 km, respectively. It has a double circuit of 380 kV, 1600-mm2, self-contained oil-filled cable directly buried in the ground. It is expected that some of the techniques developed for this project will be applicable to other, similar projects in the Middle East region

Published in:

Power Delivery, IEEE Transactions on  (Volume:3 ,  Issue: 4 )