By Topic

Optimal generation of electricity from in a hydro based system - an experience with thermal independent power producers

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Mwakabuta, N.S. ; Dar es Salaam Univ. ; Kyaruzi, A.L.

A two stage optimal generation scheduling for Tanzania Electricity Supply Company (TANESCO) System has been presented. The first stage determines the hydro generation and the second stage optimizes the thermal generation including two independent power producers (IPPs) to compliment the hydro generation if necessary. The scheduling keeps balance between production and consumption in a more reliable and economical way. Linear programming mathematical model using MATLAB has been developed and used to optimize the generation schedule of the system. The constraints include hydrological balance; thermal power plants limitations, special conditions agreed with IPPs and load requirements. The linear programming solution gave schedule with least operation costs as the generation is mainly from hydropower plants at the same time the water levels in all reservoirs are always highly conserved

Published in:

Power Engineering Conference, 2005. IPEC 2005. The 7th International

Date of Conference:

Nov. 29 2005-Dec. 2 2005