Close category search window
 

Implement of On-line Transient Stability Control Pre-decision in Wide-Area Measurement System in Jiangsu Power Network

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.
5 Author(s)
Hong Jun Li ; Dept. of Power Electr. Eng., Tsinghua Univ., Beijing ; Xiaorong Xie ; Luyuan Tong ; Jingtao Wu
more authors

Wide-area measurement system (WAMS), based on technology of synchronized phase measurement, can precisely measure real-time dynamic information of power network. It will provide new methods that achieve real-time control, stability enhancement and transfer capacity improvement in power network. WAMS constructed in Jiangsu power network, includes several PMU substations, data concentrator and central analysis sever. The whole project had finished its second stage. It can independently monitor several important power plants and substation. The on-line transient stability control pre-decision system (OTSCPS) installs in WAMS. Combined with the existed EMS, state estimation is accomplished. Based on the result of state estimation, Transient stability assessment is made by OTSCPS. It enhances the adaptability and precision of preventive and emergency control of JiangSu power network

Published in:
Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES

Date of Conference: 2005

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2013 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.