Close category search window
 

Optimal Energy Management Integration for a Petrochemical Plant Under Considerations of Uncertain Power Supplies

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)
Tung-Yun Wu ; Chem. Eng. Dept., Nat. Tsing-Hua Univ., Hsinchu, Taiwan ; Shyan-Shu Shieh ; Shi-Shang Jang ; Liu, C.C.L.

The electric power demands of many petrochemical plants are matched by supplies from an in-house cogeneration system and from the electric grid. However, due to the fluctuations of fuel costs, production, and electricity rates, it is necessary to balance electric supply between these two sources. In reality, uncertain effects play a very important role in this decision-making problem. One of the most important uncertainties is the occurrence of power interruptions from either one of the supply sources, which could endanger operability and reliability of plant operations. To minimize the total energy cost under consideration of unexpected power failures, we break up the solution of the problem into two layers. The outer layer is to determine the optimum contracting of three-section time-of-use rate. We use an artificial neural network regression model as a meta-model to simulate the contour plot of a nonconvex cost function. The occurrences of incidental power failures are simulated by the Monte Carlo method. The inner layer is to determine the optimum operation of the cogeneration system. Since the searching space is huge in the outer layer and the Monte Carlo simulation in the inner layer is time consuming, we implement an interactive sampling search approach to find the optimal contract capacity in this multi-local-optima problem.

Published in:
Power Systems, IEEE Transactions on  (Volume:20 ,  Issue: 3 )

Date of Publication: Aug. 2005

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2013 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.