By Topic

Status of wind-related US national and regional grid code activities

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Zavadil, R.M. ; EnerNex Corp., Knoxville, TN, USA ; Smith, J.C.

As the number and size of wind power plants continue to grow, utility system operators and transmission network operators around the globe have begun to take note of the possible impact of the plants on power system performance during both normal and abnormal system conditions. Until recently, the number and size of wind power plants was such that it was not uncommon for interconnection practices to require that the plant be disconnected from the grid during a system disturbance, and reconnected when the system had returned to a normal state. This is no longer commonly accepted practice, as the size of recent wind power plants is as large as a typical fossil unit, and their behavior is an important component of overall system behavior both during normal and abnormal conditions.

Published in:

Power Engineering Society General Meeting, 2005. IEEE

Date of Conference:

12-16 June 2005