Scheduled System Maintenance:
On May 6th, single article purchases and IEEE account management will be unavailable from 8:00 AM - 5:00 PM ET (12:00 - 21:00 UTC). We apologize for the inconvenience.
By Topic

Key features and engineering progress of the KSTAR Tokamak (Invited paper, ICOPS 2003)

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

15 Author(s)
Bak, J.S. ; Korea Basic Sci. Inst., Daejeon, South Korea ; Choi, C.H. ; Yang, H.L. ; Sa, J.W.
more authors

The Korea superconducting tokamak advanced research (KSTAR), which is under construction at the National Fusion R&D Center, Korea Basic Science Institute, Daejeon, Korea, has the mission to develop a steady-state capable advanced superconducting tokamak to establish the scientific and technological bases for a fusion reactor. After an intensive R&D program, substantial progress of the KSTAR tokamak engineering had been made on major tokamak structures, superconducting magnets, in-vessel components, diagnostic system, heating system, and power supplies with industrial manufacturers by May 2002. The engineering design has been elaborated to the extent necessary to allow a realistic assessment of its feasibility, performance, and cost. Since May 2003, the project has been in the phase of procurement. The fabrication of main tokamak structure such as vacuum vessel, cryostat, and supporting structures is well progressed. The manufacturing work of superconducting coils is also proceeding favorably. The tokamak assembly started in July 2003 after site preparation and assembly jig. The start of commissioning is scheduled for June 2006. This paper describes the key features and engineering progress of the KSTAR tokamak and elaborates the work currently underway.

Published in:

Plasma Science, IEEE Transactions on  (Volume:32 ,  Issue: 2 )