In this paper, the effects of transformer replacement on the electric arc furnace power system of an iron and steel plant have been investigated. The new operating strategy has been determined according to stable arc and maximum productivity requirements. Based on these new operating conditions, the sufficiency of the existing flicker compensation system in terms of the load balancing, power-factor correction, and flicker have been examined. All investigations made in this work are supported by real-time measurements
Published in:
Industry Applications, IEEE Transactions on
(Volume:36
,
Issue:
2
)
Date of Publication: Mar/Apr 2000