Asymmetry issues in power system restoration

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)

This paper is one of a series presented on behalf of the Transmission Operation Subcommittee with the intent of focusing attention on EHV asymmetry issues during restoration. Many existing EHV lines have unsymmetrical (horizontal) conductor spacing without being transposed. These characteristics generate unacceptable negative sequence currents (NSC). Under light-load condition and during restoration, NSC has caused cascade tripping of a number of generators resulting in an area wide blackouts, has prevented synchronization of incoming generators, and has blocked remote cranking of thermal units. The paper describes a simple and approximate method for assessing the extent of NSC in EHV lines and then determining corrective measures. It recommends that when attempting to provide an offsite source to a thermal power plant the extent of NSC be determined and if unacceptable, either the operation be deferred to after the initial restoration phase, or the appropriate “underlying load” be determined for connection to the receiving end of the EHV lines

Published in:

Power Systems, IEEE Transactions on  (Volume:14 ,  Issue: 3 )