Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Qi Su ; Dept. of Ind. & Syst. Eng., Florida Int. Univ., Miami, FL, USA ; Chen, F.F.

This study addresses the problem of scheduling double-gripper gantry robots and provides a structure for analyzing scheduling problems in a tightly-coupled automated serial production line with deterministic processing time. Literature to date indicates that there has been no documented effort dealing with the scheduling problem of double-gripper gantry robots. This paper presents an optimal schedule by analyzing the cycle time formula for two-station (m=2) tightly-coupled production lines served by a double-gripper gantry robot. The result is then generalized to the problem of scheduling a gantry robot in a production line with m (where m>2) workstations, and finally an optimal schedule for the m-station case is developed. The effectiveness of using double-gripper gantry robots is discussed and some analytical insights into the employment of double-gripper gantry robot are provided for manufacturing system designers

Published in:

Robotics and Automation, IEEE Transactions on  (Volume:12 ,  Issue: 1 )