By Topic

Critical considerations for utility/cogeneration inter-tie protection scheme configuration

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
Rifaat, R.M. ; Delta Catalytic Eng. & Construction Ltd., Calgary, Alta., Canada

For interties between cogeneration plants and existing host utility power systems, special considerations must be given to protection systems. The considerations are reviewed in light of contemporary experience with midsize cogenerating plants. Typical intertie configurations are deliberated. Implications on the design of protection systems are emphasized. Relevant protection schemes are presented, and their advantages and disadvantages are evaluated. The importance of examining the protection scheme requirements during the conceptual design stage of a cogenerating plant is demonstrated

Published in:

Industry Applications, IEEE Transactions on  (Volume:31 ,  Issue: 5 )