By Topic

Expected Response Times for Closed-Loop Multivehicle AMHS

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Nazzal, D. ; Georgia Inst. of Technol., Atlanta ; McGinnis, L.F.

We present an analytical approach for estimating the expected time for an automated material handling system (AMHS) to respond to move requests at loading stations in a vehicle-based, unidirectional, closed-loop AMHS. The expected response times are important for estimating the expected work-in-process (WIP) levels at the loading stations for design purposes, and for evaluating the performance of the AMHS as delayed response can impact the production cycle times. The expected response time approximation is validated by comparing the analytical model to the simulation results using a SEMATECH 300 mm hypothetical fab data set. Note to Practitioners - This paper describes an analytic method for estimating the average time for the AMHS to respond to lots ready for movement in a 300 mm wafer fab. The analysis is based on a large-scale model, requires standard solvers, and provides a very fast and reasonably accurate alternative to high-fidelity simulation. It is intended to support the early stage of fab design/redesign, allowing engineers to examine many different options before committing to the time and expense of simulation.

Published in:

Automation Science and Engineering, IEEE Transactions on  (Volume:4 ,  Issue: 4 )