By Topic

System Development Planning via System Maturity Optimization

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Jose Emmanuel Ramirez-Marquez ; Sch. of Syst. & Enterprises, Stevens Inst. of Technol., Hoboken, NJ, USA ; Brian J. Sauser

References

Showing 1-70 of 70 Results
  1. D. M. Buede, "Engineering design using decision analysis", Proc. 1994 IEEE Int. Conf. Syst., Man, Cybern., 1994 \'Humans, Inf. Technol., pp. 1868-1873
  2. R. L. Dillon , M. E. Paté-Cornell and S. D. Guikema, "Optimal use of budget reserves to minimize technical and management failure risks during complex project development", IEEE Trans. Eng. Manage., vol. 52, no. 3, pp. 382-395, 2005
  3. F. Salewski , A. Schirmer and A. Drexl, "Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application", Eur. J. Oper. Res., vol. 102, pp. 88-110, 1997 [CrossRef] 
  4. C. K. Chang , M. J. Christensen and T. Zhang, "Genetic algorithms for project management", Ann. Softw. Eng., vol. 11, pp. 107-139, 2001 [CrossRef] 
  5. C.-C. Wei , P.-H. Liu and Y.-C. Tsai, "Resource-constrained project management using enhanced theory of constraint", Int. J. Proj. Manage., vol. 20, pp. 561-567, 2002 [CrossRef] 
  6. U. D. Belhe and A. Kusiak, " Scheduling design activities with a pull system approach", IEEE Trans. Robot. Autom. , vol. 12, no. 1, pp. 15-21, 1996
  7. M. Sachon and M. E. Paté-Cornell, "Managing technology development for safety-critical systems", IEEE Trans. Eng. Manage., vol. 51, no. 4, pp. 451-461, 2004
  8. R. L. Dillon and M. E. Paté-Cornell, "APRAM: An advanced programmatic risk analysis method", Int. J. Technol., Policy, Manage., vol. 1, pp. 47-65, 2001 [CrossRef] 
  9. R. L. Dillon , M. E. Paté-Cornell and S. D. Guikema, "Programmatic risk analysis for critical engineering systems under tight resource constraints", Oper. Res. , vol. 51, pp. 354-370, 2003 [CrossRef] 
  10. M. T. Pich , C. H. Loch and A. D. Meyer, "On uncertainty, ambiguity, and complexity in project management", Manage. Sci., vol. 48, pp. 1008-1023, 2002 [CrossRef] 
  11. H. A. U. de Haes, "Life-cycle assessment and the use of broad indicators ", J. Ind. Ecol., vol. 10, pp. 5-7, 2006 [CrossRef] 
  12. S. M. Yacoub and H. H. Ammar, "A methodology for architecture-level reliability risk analysis", IEEE Trans. Softw. Eng., vol. 28, no. 6, pp. 529-547, 2002
  13. J. E. Smith and D. von Winterfeldt, "Decision analysis in management science", Manage. Sci., vol. 50, pp. 561-574, 2004 [CrossRef] 
  14. T. Dowling and T. Pardoe, TIMPA—Technology Insertion Metrics, vol. 1, 2005, Ministry of Defence
  15. S. R. Sadin , F. P. Povinelli and R. Rosen, "The NASA technology push towards future space mission systems", Acta Astronaut., vol. 20, pp. 73-77, 1989 [CrossRef] 
  16. J. W. Bilbro, Technology Maturity Conference: Multi-Dimensional Assessment of Technology Maturity, 2007, AFRL
  17. J. Connelly , K. Daues , R. K. Howard and L. Toups, "Definition and development of habitation readiness level (HRL) for planetary surface habitats", Proc. 10th Biennial Int. Conf. Eng., Construction, Operations Challenging Environ., pp. 81, 2006 [CrossRef] 
  18. D. Cundiff, "Manufacturing readiness levels (MRL)", 2003
  19. J. Smith, "An alternative to technology readiness levels for non-developmental item (NDI) software", Carnegie Mellon, Pittsburgh, PA, Tech. Rep., CMU/SEI-2004-TR-013, Apr. 2004
  20. R. Valerdi and R. J. Kohl, "An approach to technology risk management", Eng. Syst. Division Symp. , 2004
  21. R. Shishko , D. H. Ebbeler and G. Fox, "NASA technology assessment using real options valuation", Syst. Eng., vol. 7, pp. 1-12, 2003 [CrossRef] 
  22. B. Sauser , D. Verma , J. Ramirez-Marquez and R. Gove, "From TRL to SRL: The concept of systems readiness levels ", Conf. Syst. Eng. Res., 2006
  23. "DoD, Technology Readiness Assessment (TRA) Deskbook, DUSD(S&T), Ed. Washington, DC: Dept. of Defense, 2005"
  24. "GAO, Better Weapon Program Outcomes Require Discipline, Accountability, and Fundamental Changes in the Acquisition Environment, vol. GAO-08-782 T, GAO, Ed.", 2008, U.S. Government Accountability Office
  25. "GAO, Defense Acquisitions: Assessments of Selected Major Weapon Programs , vol. GAO-05-301, GAO, Ed.", 2005, U.S. Government Accountability Office
  26. GAO Department of Energy: Major Construction Projects Need a Consistent Approach for Assessing Technology Readiness to Help Avoid Cost Increases and Delays, vol. GAO-07–336, GAO, Ed., 2007, U.S. Government Accountability Office
  27. P. A. Sandborn , T. E. Hearld , J. Houston and P. Singh, "Optimum technology insertion into systems based on the assessment of viability", IEEE Trans. Compon. Packag. Technol., vol. 26, no. 4, pp. 734-738, 2003
  28. V. S. Parsons, "Project performance: How to assess the early stages", Eng. Manage. J., vol. 18, pp. 11-16, 2006
  29. R. M. Henderson and K. Clark, "Architectural innovation: The reconfiguration of existing product technologies and the failure of established firms", Adm. Sci. Quart., vol. 35, pp. 9-30, 1990 [CrossRef] 
  30. S. Nambisan, "Complementary product integration by high-technology new ventures: The role of initial technology strategy", Manage. Sci., vol. 48, pp. 382-398, 2002 [CrossRef] 
  31. R. J. Watts and A. L. Porter, "R&D cluster quality measures and technology maturity", Technol. Forecast. Social Change, vol. 70, pp. 735-758, 2003 [CrossRef] 
  32. "DoD, Levels of Information Systems Interoperability.", 1998, Dept. of Defense
  33. J. C. Mankins, "Approaches to strategic research and technology (R&T) analysis and road mapping", Acta Astronaut., vol. 51, pp. 3-21, 2002 [CrossRef] 
  34. J. Fang , S. Hu and Y. Han, "A service interoperability assessment model for service composition", Proc. IEEE Int. Conf. Serv. Comput. (SCC’04) , pp. 153-158
  35. E. G. Nilsson , E. K. Nordhagen and G. Oftedal, "Aspects of systems integration ", Proc. 1st Int. Syst. Integr., pp. 434-443, 1990
  36. R. Gove, Development of an integration ontology for systems operational effectiveness,, 2007
  37. R. Gove , B. Sauser and J. Ramirez-Marquez, "Integration maturity metrics: Development of an integration readiness level", School of Systems and Enterprises, Stevens Inst. Technol., Hoboken, NJ, SSE_S& EM_004_2007, 2007
  38. B. Sauser , J. Ramirez-Marquez , R. Magnaye and W. Tan, "A Systems approach to expanding the technology readiness level within defense acquisition", Int. J. Defense Acquisition Manage., vol. 1, pp. 39-58, 2008
  39. B. Sauser , J. Ramirez-Marquez , D. Henry , D. DiMarzio and J. Rosen, " Methods for estimating system readiness levels", School of Systems and Enterprises White Paper, 2007
  40. D. Verma , J. Beck and T. Parry, "Designing and assessing supportability in DoD weapon systems: A guide to increased reliability and reduced logistics footprint", OSD, Ed. Washington, DC: DoD, 2003
  41. D. Verma , J. Farr and L. H. Johannesen, "System training metrics and measures: A key operational effectiveness imperative", Syst. Eng., vol. 6, pp. 238-248, 2003 [CrossRef] 
  42. J. E. Ramirez-Marquez and D. Coit, "A heuristic for solving the redundancy allocation problem for multistate series-parallel systems ", Reliabil. Eng. Syst. Saf., vol. 83, pp. 341-349, 2004 [CrossRef] 
  43. J. E. Ramirez-Marquez , D. Coit and A. Konak, "Reliability optimization of series-parallel systems using a max-min approach", IIE Trans., vol. 36, pp. 891-898, 2004 [CrossRef] 
  44. D. Kumar , D. Nowicki , J. E. Ramirez-Marquez and D. Verma, "On the optimal selection of process alternatives in a six sigma project ", Int. J. Prod. Econ., vol. 111, pp. 456-467, 2008 [CrossRef] 
  45. J. E. Ramirez-Marquez and D. Coit, "Multistate component criticality analysis and reliability prioritization in multistate systems ", Reliabil. Eng. Syst. Saf., vol. 92, pp. 1608-1619, 2007 [CrossRef] 
  46. J. E. Ramirez-Marquez and D. Coit, "Optimization of system reliability in the presence of common cause failures", Reliabil. Eng. Syst. Saf., vol. 92, pp. 1421-1434, 2007 [CrossRef] 
  47. H. Taboada , F. Baheranwala , D. Coit and N. Wattanapongsakorn, "Practical solutions for multi-objective optimization: An application to system reliability design problems", Reliabil. Eng. Syst. Saf., vol. 92, pp. 314-322, 2007 [CrossRef] 
  48. H. Taboada , J. Espiritu and D. Coit, "MOMS-GA: A multi-objective multi-state genetic algorithm for system reliability optimization design problems", IEEE Trans. Reliabil., vol. 57, no. 1, pp. 182-191, 2006
  49. P. Pardalos and M. Resende, Handbook of Applied Optimization, 2002, Oxford Univ. Press
  50. A. Ravindran, Operations Research and Management Science Handbook, 2007, CRC Press [CrossRef] 
  51. M. Corstjens and P. Doyle, " A model for optimizing retail space allocations", Manage. Sci., vol. 27, pp. 822-833, 1981 [CrossRef] 
  52. M. Ferris , J. Lim and D. Shepard, "An optimization approach for radiosurgery treatment planning", SIAM J. Optim., vol. 13, pp. 921-937, 2002 [CrossRef] 
  53. J. M. Mulvey , D. P. Rosenbaum and B. Shetty, "Parameter estimation in stochastic scenario generation systems", Eur. J. Oper. Res., vol. 118, pp. 563-577, 1999 [CrossRef] 
  54. J. E. Ramirez-Marquez and C. Rocco, "All-terminal network reliability optimization via probabilistic solution discovery", Reliabil. Eng. Syst. Saf., vol. 93, pp. 1689-1697, 2007 [CrossRef] 
  55. J. E. Ramirez-Marquez and C. Rocco, "Probabilistic knowledge discovery algorithm in network reliability optimization", ESREL Annu. Conf., 2007
  56. C. Rocco and J. E. Ramirez-Marquez, "Deterministic network interdiction optimization via an evolutionary approach", Reliabil. Eng. Syst. Saf., vol. 94, no. 2, pp. 568-576, 2009 [CrossRef] 
  57. J. E. Ramirez-Marquez, Handbook on Performability Engineering,, 2008, Springer-Verlag
  58. J. E. Ramirez-Marquez, "Port-of-entry safety via the reliability optimization of container inspection strategy through an evolutionary approach", Reliabil. Eng. Syst. Saf., vol. 93, pp. 1698-1709, 2008 [CrossRef] 
  59. J. L. Cook and J. E. Ramirez-Marquez, "Optimal design of cluster based ad-hoc networks using probabilistic solution discovery ", Reliabil. Eng. Syst. Saf., vol. 94, no. 2, pp. 218-228, 2009 [CrossRef] 
  60. T. Bäck and H. P. Schwefel, "Evolutionary computation: An overview", Proc. 1996 IEEE Int. Conf. Evol. Comput., pp. 20-29
  61. H. P. Schwefel and T. Bäck, J. Periaux and G. Winter, Genetic Algorithm in Engineering and Computer Science, 1995, Wiley
  62. D. King, "Saving hubble", Proc. 55th Int. Astronaut. Congr., pp. 3223-3230, 2004
  63. L. J. Lanzerotti, 2005, National Academies Press
  64. J. J. Mattice, "Hubble space telescope: Systems engineering case study", C.f.S. Engineering, Ed. Hobson Way, OH: Air Force Inst. Technol. 2005
  65. M. E. Paté-Cornell and R. L. Dillon, "Success factors and future challenges in the management of faster-better-cheaper projects: Lessons learned from NASA", IEEE Trans. Eng. Manage., vol. 48, no. 1, pp. 25-35, 2001
  66. B. Sauser, "Toward mission assurance: A framework for systems engineering management ", J. Syst. Eng., vol. 9, pp. 213-227, 2006 [CrossRef] 
  67. B. J. Sauser , A. J. Shenhar and E. J. Hoffman, T. R. Anderson , T. U. Daim , D. F. Kocaoglu , D. Z. Milosevic and C. M. Weber, Technology Management: A Unifying Discipline for Melting the Boundaries, pp. 392-402, 2005, IEEE Press
  68. A. Shenhar and B. Sauser, 2nd ed. A. P. Sage and W. R. Rouse, Handbook of Systems Engineering and Management, 2008, Wiley
  69. K. Forsberg , H. Mooz and H. Cotterman, Visualizing Project Management , 2000, Wiley
  70. K. P. Grant and J. S. Pennypacker, "Project management maturity: An assessment of project management capabilities among and between selected industries", IEEE Trans. Eng. Manage., vol. 53, no. 1, pp. 59-68, 2006