Abstract:
Superseded by C37.122-1993.. The technical requirements for the design, fabrication, testing, and installation of a gasinsulated substation (GIS) are covered. The paramet...Show MoreMetadata
Abstract:
Superseded by C37.122-1993.. The technical requirements for the design, fabrication, testing, and installation of a gasinsulated substation (GIS) are covered. The parameters to be supplied by the purchaser are set, and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are established.
Date of Publication: 19 September 1988
Electronic ISBN:978-0-7381-4435-1
ICS Code: 27.100 - Power stations in general
Persistent Link: https://ieeexplore.ieee.org/servlet/opac?punumber=2621