Abstract:
This paper proposes a multi-objective hyperheuristic (MOO-HMHH) algorithm for the flexible job shop scheduling problem (FJSP) with sequence-dependent set-up times, auxili...Show MoreMetadata
Abstract:
This paper proposes a multi-objective hyperheuristic (MOO-HMHH) algorithm for the flexible job shop scheduling problem (FJSP) with sequence-dependent set-up times, auxiliary resources and machine down time. Two variations of the algorithm were implemented and evaluated on real customer datasets. The hyper-heuristic algorithms compared well to their constituent algorithms and promising results were obtained with respect to the increased generality of the hyperheuristics.
Date of Conference: 23-25 November 2016
Date Added to IEEE Xplore: 05 October 2017